References

Projects of different sizes, with different starting points and goals.

25 years of logistics projects

Customers in 15 countries — in Europe and Latin America

Brick-and-mortar or e-commerce, manufacturing or contract logistics, fully manual warehouse or fully automated distribution center — we have made them all work.

Map of the countries where LOCOSO customers are based: Austria, Brazil, Estonia, France, Germany, Italy, Mexico, Panama, Poland, Romania, Russia, Serbia, Slovenia, Sweden, United KingdomSwedenEstoniaRussiaUnited KingdomPolandGermanyAustriaFranceSloveniaRomaniaSerbiaItalyMexicoPanamaBrazil
  • Colorful Catrina figure by the roadside in Mexico
  • Fruit stand with Brazilian flags in the São Paulo market hall
  • View over the old town of Salzburg with its fortress

Selected projects

From a high-bay warehouse to a distribution center for 900 stores

  • WMS and material flow controller
  • Highly automated
  • Pharma

Highly automated distribution center for 900 stores

  • 65,000items
  • 600,000order lines per day
  • 172,000shuttle totes
Starting point
A new distribution center is to supply around 900 stores in a metropolitan area. A general contractor delivers the warehouse automation — what is needed is the software that centrally controls all warehouse processes and the entire plant.
Implementation
As software supplier to the general contractor, we designed, built and rolled out the integrated solution, including all interfaces to the customer’s ERP — and were the customer’s first point of contact throughout the project. Fully integrated, WMS and material flow controller run tote conveyors, shuttle storage, automated picking systems and goods-to-person workstations with pick-to-light and pick-to-belt, exchanging data with the controls in real time.
Result
The WMS is the central platform for all warehouse processes: 65,000 items, 172,000 shuttle totes, 20,000 pallet locations, 56 sorter chutes in goods issue and up to 600,000 order lines and 6,000 goods receipt postings every day.

Customer: Pharmaceutical distribution, based in Latin America

  • More than WMS
  • Data hub
  • Food retail

LAPS as the data hub for 450 stores

  • 450stores
  • 80+interface processes
  • 5WMS in five warehouses connected
Starting point
The regional subsidiary of a large retail group replaces its legacy system for store ordering: from now on, the group’s central ordering system calculates order proposals automatically from historical data. All 450 stores switch over — so the system landscapes of the group and the subsidiary have to work together reliably.
Implementation
On the LAPS platform we built a data hub with an interface framework that connects both system landscapes: one ERP system, five WMS in five warehouses and a shipment tracking system. The logistics cockpit was built with LAPS as well — monitoring for the data hub and a tool for first-level support when data errors occur.
Result
A seamless data flow with more than 80 interface processes — and proof that LAPS reaches far beyond WMS and WCS: data hub, interfaces and cockpit come from the same platform.
The LAPS platform on laps.at

Customer: Food retail, regional subsidiary of a retail group, based in Central Europe

  • WMS extension
  • Automation integration
  • Wholesale

New automated warehouse connected to the existing WMS

  • 90,000tote locations in the shuttle warehouse
  • 25,000pallet locations in the high-bay warehouse
  • 12automated aisles
Starting point
A wholesaler expands its logistics center with an automated warehouse: a shuttle system for picking and an automated double-deep pallet high-bay warehouse, supplied by an automation vendor with its own material flow controller. The existing WMS is to remain with its full functionality — the new warehouse has to fit seamlessly into the flow of goods.
Implementation
Together with the customer and the automation vendor, we defined the processes in on-site workshops, wrote the specification and modeled the new warehouse in the WMS. We activated the interface to the material flow controller and extended it with new data flows, and added new processes to the WMS: relocation and consolidation of picking pallets, pick-to-bin, pick-to-pallet and negative picking. Testing, commissioning, key-user training and go-live, including on-site production support, also came from us.
Result
The automated warehouse runs within the existing WMS, and the host interface remained unchanged. Since go-live we have been developing the WMS further in change packages and supporting operations, for example during stocktaking.

Customer: Wholesale of agricultural and pet supplies, based in Germany

  • WMS and material flow controller
  • Replacement in stages
  • High-bay warehouse

WMS and material flow controller for an automated high-bay warehouse

  • 4,734pallet locations
  • 3aisles
  • 2stages instead of a big bang
Starting point
An automated high-bay warehouse with 3 aisles and 4,734 pallet locations needs new warehouse software — without touching the existing automation equipment and without a big bang.
Implementation
Stage 1: go-live of the WMS, with the existing material flow controller connected. Stage 2: around eight months later, the existing material flow controller was replaced by the LAPS material flow controller. Design, implementation, go-live, support and maintenance all come from us.
Result
WMS and material flow controller from a single source, introduced in two stages — the automation equipment was kept unchanged.

Customer: Food retail, based in Central Europe

Let's talk about your warehouse.

A meeting, an inquiry or your tender: you describe your operations, we tell you honestly whether LAPS WMS is the right fit.